Construction Process
Our Professional Step-by-Step Process
1. Design Layout
The pool design is painted and staked on the property, per the sales agreement. The pool elevation and equipment location will be determined at this time.
4. Bonding Inspection
County Inspection is completed.

5. Short Stub Plumbing
The return lines, skimmers and main drain will be installed to help streamline the construction process.
6. Concrete Shell
The wet-mix shotcrete shell of your swimming pool will be sculpted, matching the detail of your specs.
7. Plumbing/Electric/Gas
The equipment will be set, and the plumbing lines will be run in ditches to ensure their safety. The electrical lines will be located in the same trenches and tied into your home’s electrical panel. Gas will follow if necessary.
8. Underground Inspection
County Inspection is completed. The electrical and gas lines will be inspected by a county inspector.

9. Deck Grading & Bonding
The trenches will be covered, and a copper wire will be bonded to the rebar in the pool.
10. Bonding Inspection
County Inspection completed.

12. Decking
We will meet at this point to lay out the decking area, after which the deck will be installed (concrete, pavers, etc).
13. Plaster/Pebble Tec
The interior finish of your choice will be applied to the shotcrete shell of your pool.
15. Indoctrination
We will schedule a meeting to assist you in the operation of your pool equipment (Pool School).
16. Final Inspection
County Inspection completed.